Register  |  Login
 
Site Sponsor
The 999 team is a diverse group of companies with a single focus of contingency planning and disaster response.
Project ARGUS Events
Be Prepared for Terrorism CBRN, Pandemic and natural disaster.Apply the Project Argus message to your existing contingency plans or develop Business Continuity and contingency plans from our "Free" training and templates.



We are pleased to present the government counter terrorist initiative "Project Argus" in association with a full days training and group workshop. Project Argus will form the basis of the days training with a simulated attack designed to promote measures you can take for preventing, handling and recovering from a terrorist attack and natural or accidental disruptive event. For more details Click here
Training >> Toxic & allergenic mould
Toxic & allergenic mould

20 Toxic & allergenic Mould

The continuing quest for better insulated homes coupled to replacement of brick and stone with paper and chalk and timber framing has resulted in a serious combination of moisture containment and mould growth. Although mould is found all over the planet the growth in the sealed built or home environment is a relatively new phenomenon. Poor drying after flood or water leaks is another cause for concern and although only 16 moulds have been identified as toxic but all are said to allergenic.

 

Course syllabus

Mould overview
Health Hazards
Legal issues & legislation
Exposure routes
Allergic reactions
Toxic effects
PPE requirements
ODTS Organic Dust Toxic Syndrome
Types of Mould
Reproduction and grow
Types of colonisation
Uses of mould from food
Growth requirements
Primary & secondary metabolite
Mycotoxins, VOCs & MVOC
Measurement of conditions
Measurement & Identification of Mould
International Decontamination Guidelines
Decontamination principles of buildings
Decontamination principles of contents and furnishings
Site containment and controls
Mould sampling criteria
Clearance and claim closure
Waste Dispposal