Project ARGUS Events
Be Prepared for Terrorism CBRN, Pandemic and natural disaster.Apply the Project Argus message to your existing contingency plans or develop Business Continuity and contingency plans from our "Free" training and templates.



We are pleased to present the government counter terrorist initiative "Project Argus" in association with a full days training and group workshop. Project Argus will form the basis of the days training with a simulated attack designed to promote measures you can take for preventing, handling and recovering from a terrorist attack and natural or accidental disruptive event. For more details Click here
Training >> CBR Building Defence & Occupant Protection
CBR Building Defence & Occupant Protection

Section G

CBR Building Defence & Occupant Protection

Focus: Employers Facility Managers

 

Foreword

This module provides the knowledge to undertake a site specific Terrorist CBR defence plan. The syllabus identifies the hazards and risks, spread and ingress routes of contamination. The defence of building and protection of occupants is the main goal and several plans are explained to assist in site specific plan development.

 

1) Health & safety Legislation
a) Overview
b) Specific responsibilities
c) Necessity

 

2) General responsibilities and Legal responsibility/ liability
a) Legal duties and obligations
b) Duty to protect employees and personnel/building occupants
c) Duty to mitigate (insurance policy caveat)
d) Building Insurance Policy issues
i) Policy Limitations
ii) Conflicts (multi tenancy)
iii) Pool Re
iv) Wording and exclusions
v) Contamination V damage
vi) Clearance time and cost issues
vii) Multi tenancy/policy complications
viii) Decontamination failure?
e) Civil & Criminal liabilities
f) Ramifications of CCA (civil contingencies act)

 

3) Cost & time issues
a) Time line to Blue Light assistance
b) Cost & time line to decontamination
c) Cost savings from preventable contamination or evacuation
d) Loss of building –rent /value considerations

 

4) Business Disruption Awareness
a) Hoax or Confirmed Incident cost reduction
b) Unnecessary evacuation issues
c) Employee confidence building
d) Disruption reduction
e) Productivity protection
f) Business Continuity issues
g) Disaster recovery issues
h) Natural disasters
i) Flooding
ii) Fire & explosion
iii) Horizon scanning

 

5) Reducing absenteeism
a. Confidence building
b. Awareness
c. Trust
6) Associated risks and hazards

 

7) Contamination types, effect and dispersal routes
a. CBR & characteristics
b. Chemical
c. Biological
d. Radiological
e. TICs

 

8) General characteristics
a. Height & plume direction
b. Effects of buildings and urban environment
c. Wind speed and velocity
d. The rural environment
e. Swirl & wind turbulence
f. Pressure Plain

 

9) Internal distribution & control factors
a. Ventilation ductwork
b. Laminar and turbulent air flow
c. Lift action
d. Kitchen & toilet extracts
e. Interstitial cavities
f. Building envelope
g. Risers
h. Supply inlets
i. AHUs
j. Windows
k. People

 

10) Generic Government Advice (ODPM - DEFRA)
a. Review of published documents
b. Assessments of Generic & Specific plans

 

11) Identification & Measurement
a. Measuring leakage to prevent ingress
b. Flow routes (safe haven identification)

 

12) Site Specific Enhancement Controls
a. External Security
b. Internal Security
c. Reception controls
d. Visitors & site security
e. Post room events
f. Mechanical & Electrical controls
13) Event Planning
a. Building assessments
b. Maximising possible controls
c. Developing additional controls
d. Development of Safe Haven
e. Developing Resilience
f. Building Log
g. Asbestos
h. Coshh
i. Known hazards
j. Liaison team

 

14) Assisting Blue light responders
a. Information details
b. Personnel affected
c. Visual commentary
d. Known facts
e. Evidence
f. Route Plans for responders
g. Containment

 

15) Hard Engineering Control assessments
a. Improving filtration
b. Improving site controls

 

16) Planning and Soft Engineering
a. Localised controls
b. Activation procedures

 

17) Incident Response assessments
a. Designated IRT
b. Equipment & Training
c. Notification & Response times
d. Authority to activate plans
e. Invocation of plans

 

18) Failure and Ramifications
a. Alert interested parties
b. Contingency planning
c. Open forum
d. Hearts & Minds

 

19) Training & Equipment
a. Budget & Authority
b. Surveys
c. Engineering controls
d. Training
e. Equipment
f. PPE
g. Audit

 

20) Your Day in Court
a. Defending your actions
b. Proving your defence